ZRH → BOMZurich to Mumbai

live

Direct flights from Zurich (ZRH) to Mumbai (BOM): 7 nonstop departures observed each week across 1 airline. 50% of the last 6 tracked flights arrived within 15 minutes of schedule. The median arrival is 16 minutes late. No cancellations were recorded across the 8 tracked flights. The nonstop covers 6,540 km, an estimated 8 hours 53 minutes in the air. Measured by Pro Flight Search from live flight boards at Zurich and Mumbai. Updated 23 November 2026 at 10:09 UTC.

Today, ZRH → BOM

Mon 23 Nov · local times
  1. 09:50 LX154SWISS Left 10:00 +10 BOM est. 22:04In the air · sched 22:55

Checked ZRH board 10:58 · BOM board 15:39

ZRH Zurich smooth · +4
BOM Mumbai smooth · +0
6,540 km · ~8h 53m est.
departs 09:507x weekly
Runs rough · 1 airline · 7x weekly · nonstop
50% on time

of the last 6 tracked ZRH → BOM flights arrived within 15 minutes

Median arrival delay is +16 min. 0 of 8 tracked legs cancelled in the sample. Will a delayed flight be cancelled? →

Median arrival+16 minacross the last 6 arrivals
Flight time~8h 53mestimated from route distance
Weekly departures7x1 direct airline on the leg

The week

scheduled departures · origin local time
06121824
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Swiss International Air Lines

Each mark is a scheduled departure at its origin-local time, observed operating in the last 7 days. Today is highlighted.

Who flies it

observed on the boards · 7 days
Swiss International Air LinesLX50% on time

Flights LX154 09:50 daily

History

operated legs · board outcomes
11-23LX154departed+10
11-22LX154dep +33 → arr−8
11-21LX154dep +3 → arr−12
11-20LX154dep +12 → arr+16
11-19LX154dep +47 → arr+20
11-18LX154departed+15
11-17LX154dep +14 → arr+24
11-16LX154dep +1 → arr−2

Actual board outcomes rather than schedules, paired departure and arrival per flight and day.

Full board history, day by day →

Airports right now

live boards
ZRHZurich +4 min smooth ⛅ mostly cloudy · NNE 4 kt Full ZRH delay board →
BOMMumbai +0 min smooth Full BOM delay board →

Weather lens

Conditions are tightest at ZRH: a 19% chance of a 15+ minute delay. In this weather, the more delayed of the two airports is typically about +5 min. Both figures come from the two airports' delay records in similar weather. See live delays → · Weather risk by airport →

How the Zurich to Mumbai route actually runs

Pro Flight Search records official board updates for nonstop ZRH to BOM flights through the day: schedules, estimates, gate pushes and actual departures. The verdict above comes from operated flights, so it reflects what this route does rather than what the timetable promises.

Planning around a delay? Live airport delays · Weather delay risk map · Will a delayed flight be cancelled? · Do planes make up time in the air? · How we measure

Cite this data

Journalists, bloggers, and researchers may cite this page with attribution and a link to Pro Flight Search.

Suggested citation

Pro Flight Search: Zurich (ZRH) to Mumbai (BOM) route reliability, measured from operated flights on official airport boards.

Canonical URL
https://proflightsearch.com/search-flights/ZRH-BOM
How we measure this →

ZRH to BOM questions

Is ZRH–BOM running on time right now?

Smooth skies ahead. The departure side at ZRH is the weaker end, route health score 96/100. The airports section above carries the live status and delay window at both ends.

How long is the flight from ZRH to BOM?

Great-circle distance is 6,540 km. With typical jet cruise speed plus taxi, climb and descent, expect roughly 492–591 min gate-to-gate on this route.

How often does ZRH–BOM fly?

Swiss International Air Lines runs the route with about 7 flights a week (daily). Since one carrier owns the route, a single disruption tends to ripple through the day.

What does the route health score measure?

A blend of departure-side delay at ZRH and arrival-side delay at BOM, computed from rolling delay windows (refreshed every 40 minutes) with a daily-rollup fallback. Current MVFR, IFR, or LIFR endpoint weather caps the score when flight rules can limit throughput. Higher is healthier: 100 means operations are clean at both ends.