HDO → BLRGhaziabad to Bengaluru

live

Direct flights from Ghaziabad (HDO) to Bengaluru (BLR): 7 nonstop departures observed each week across 1 airline. 100% of the last 7 tracked flights arrived within 15 minutes of schedule. The median arrival is 7 minutes early. No cancellations were recorded across the 7 tracked flights. The nonstop covers 1,725 km, an estimated 2 hours 43 minutes in the air. Measured by Pro Flight Search from live flight boards at Ghaziabad and Bengaluru. Updated 2 November 2026 at 05:40 UTC.

Today, HDO → BLR

Mon 2 Nov · local times
  1. · 6E2519IndiGo On schedule BLR est. 07:08sched 07:50

Checked BLR board 11:10

HDO Ghaziabad tracking
BLR Bengaluru smooth · +0
1,725 km · ~2h 43m est.
departs 10:257x weekly
Runs reliable · 1 airline · 7x weekly · nonstop
100% on time

of the last 7 tracked HDO → BLR flights arrived within 15 minutes

Median arrival delay is −7 min. 0 of 7 tracked legs cancelled in the sample. Will a delayed flight be cancelled? →

Median arrival−7 minacross the last 7 arrivals
Flight time~2h 43mestimated from route distance
Weekly departures7x1 direct airline on the leg

The week

scheduled departures · origin local time
06121824
Mon
Tue
Wed
Thu
Fri
Sat
Sun
IndiGo

Each mark is a scheduled departure at its origin-local time, observed operating in the last 7 days. Today is highlighted.

Who flies it

observed on the boards · 7 days
IndiGo6E100% on time

Flights 6E2519 10:25 daily

History

operated legs · board outcomes
11-016E2519arrived−17
10-316E2519arrived−14
10-306E2519arrived+10
10-296E2519arrived−5
10-286E2519arrived−30
10-276E2519arrived−7
10-266E2519arrived+3

Actual board outcomes rather than schedules, paired departure and arrival per flight and day.

Full board history, day by day →

Airports right now

live boards
HDOGhaziabad tracking Full HDO delay board →
BLRBengaluru +0 min smooth Full BLR delay board →

How the Ghaziabad to Bengaluru route actually runs

Pro Flight Search records official board updates for nonstop HDO to BLR flights through the day: schedules, estimates, gate pushes and actual departures. The verdict above comes from operated flights, so it reflects what this route does rather than what the timetable promises.

Planning around a delay? Live airport delays · Weather delay risk map · Will a delayed flight be cancelled? · Do planes make up time in the air? · How we measure

Cite this data

Journalists, bloggers, and researchers may cite this page with attribution and a link to Pro Flight Search.

Suggested citation

Pro Flight Search: Ghaziabad (HDO) to Bengaluru (BLR) route reliability, measured from operated flights on official airport boards.

Canonical URL
https://proflightsearch.com/search-flights/HDO-BLR
How we measure this →

HDO to BLR questions

Is HDO–BLR running on time right now?

Smooth skies ahead. Both endpoints currently score the same, route health score 100/100. The airports section above carries the live status and delay window at both ends.

How long is the flight from HDO to BLR?

Great-circle distance is 1,725 km. With typical jet cruise speed plus taxi, climb and descent, expect roughly 152–178 min gate-to-gate on this route.

How often does HDO–BLR fly?

IndiGo runs the route with about 7 flights a week (daily). Since one carrier owns the route, a single disruption tends to ripple through the day.

What does the route health score measure?

A blend of departure-side delay at HDO and arrival-side delay at BLR, computed from rolling delay windows (refreshed every 40 minutes) with a daily-rollup fallback. Current MVFR, IFR, or LIFR endpoint weather caps the score when flight rules can limit throughput. Higher is healthier: 100 means operations are clean at both ends.