SG5023Nouvelle Air Affaires Gabon · DXB → BOM
live · 5m ago
Route confirmed Nouvelle Air Affaires Gabon

SG5023 DubaiDXB · 04:15 MumbaiBOM · 08:45

SG5023 by Nouvelle Air Affaires Gabon flies from Dubai (DXB) to Mumbai (BOM) for the Mon, Oct 12 departure.

Right nowCancelled today · DXB → BOM
Cancelled

today's DXB → BOM operation will not depart

⚖ SG5023 typically leaves −53 and lands −424. The air wins minutes back.

Where the minutes go

last 7 operations · gate push → arrival
0+30+60+90 min
10-12
CANCELLED
10-11
+27 gate · −180 arrival
10-10
CANCELLED
10-09
−719 gate · −700 arrival
10-08
−460 gate · −462 arrival
10-07
+14 gate · +26 arrival
10-06
−53 gate · −42 arrival

The bar is how late it left the gate; the ring is where it actually arrived. Board clocks, not estimates.

The last 30 days

arrival outcome per operation

median arrival −424 min · 2 cancelled · 14 operations tracked

The route today

live boards
DXBDubaiModerate riskDXB delay board →
BOMMumbaiOn-time likelyBOM delay board →
DXB→BOMevery carrier, schedules and on-time historyRoute intelligence →

When it flies

scheduled departures
061422
M
T
W
T
F
S
S

Each mark is a scheduled departure at its origin-local time. Today is highlighted.

Other Dubai to Mumbai flights today

same route · Nouvelle Air Affaires Gabon
SG9023departs 01:15
SG14departs 02:15
SG9014departs 02:25
SG5014departs 12:00
SG60departs 16:00
SG9923departs 21:55

If SG5023 is cancelled, these are the other Nouvelle Air Affaires Gabon nonstop flights from Dubai to Mumbai on the same day, with scheduled departure times in DXB local time. Most flights posting a delay still operate — rebooking usually only beats a very large posted delay. Every airline on this route →

How SG5023 actually runs

Pro Flight Search has tracked every published board update for SG5023 across the DXB and BOM boards: schedule changes, gate pushes and actual clocks. Usually lands ~462 min early. Based on 11 confirmed landings · 8/11 within 15 min of schedule. Pushes back late but makes up time in the air.

The verdict above is that record speaking, so it reflects how SG5023 operates rather than what the timetable promises. Numbers refresh as new flights operate.

Technical record

How this operation is measured

board clocksaircraft

Board log

scheduled → actual, per operation
10-12CANCELLED
10-11DXB 04:15 04:42 (+27)BOM 08:45 05:45 (−180)
10-10CANCELLED
10-09DXB 04:15 16:16 (−719)BOM 08:45 21:05 (−700)
10-08DXB 04:15 20:35 (−460)BOM 08:45 01:03 (−462)
10-07DXB 04:15 04:29 (+14)BOM 08:45 09:11 (+26)
10-06DXB 04:15 03:22 (−53)BOM 08:45 08:03 (−42)
10-05DXB 04:15 14:30 (+615)BOM 08:45 19:13 (+628)
10-04DXB 04:15 16:11 (+716)BOM 08:45 20:53 (−712)
10-03DXB 04:15 17:29 (−646)BOM 08:45 22:20 (−625)
10-02DXB 04:15 20:05 (−490)BOM 08:45 00:41 (−484)
10-01DXB 04:15 21:04 (−431)BOM 08:45 01:41 (−424)
09-30DXB 04:15 16:44 (−691)BOM 09:10 21:25 (−705)
09-29DXB 04:15 (+0)BOM 09:10 (+0)

Aircraft

Recent tails: VT-SGV.

Board clocks recorded as DXB and BOM published them.

Cite this data

Journalists, bloggers, and researchers may cite this page with attribution and a link to Pro Flight Search.

Suggested citation

Pro Flight Search — SG5023 Dubai to Mumbai on-time performance, measured from the DXB and BOM airport boards.

Canonical URL
https://proflightsearch.com/flight/SG5023
How we measure this →