QP1820Akasa Air · DEL → BOM
live · 11m ago
Route confirmed Akasa Air

QP1820 New DelhiDEL · 17:30 MumbaiBOM · 19:50

QP1820 by Akasa Air flies from New Delhi (DEL) to Mumbai (BOM) for the Sun, Oct 11 departure.

Right nowExpected in Mumbai · On Time
19:50

arrival expected at BOM · on schedule

Typical gate push+0 minmedian posted departure
Typical arrival+13 minmedian over 10 operations
Cancellation0 in 10tracked operations · cancellation odds calculator →

Where the minutes go

last 7 operations · gate push → arrival
0+30+60+90 min
10-10
+0 gate · +81 arrival
10-09
+0 gate · +13 arrival
10-08
+0 gate · +14 arrival
10-07
+0 gate · +18 arrival
10-06
+0 gate · +17 arrival
10-05
+0 gate · −27 arrival
10-04
+0 gate · −18 arrival

The bar is how late it left the gate; the ring is where it actually arrived. Board clocks, not estimates.

The last 30 days

arrival outcome per operation

median arrival +13 min · 0 cancelled · 10 operations tracked

The route today

live boards
DELNew DelhiOn-time likelyDEL delay board →
BOMMumbaiOn-time likelyBOM delay board →
DEL→BOMevery carrier, schedules and on-time historyRoute intelligence →

When it flies

scheduled departures
061422
M
T
W
T
F
S
S

Each mark is a scheduled departure at its origin-local time. Today is highlighted.

Other New Delhi to Mumbai flights today

same route · Akasa Air
QP6520departs 02:00
QP1833departs 06:50
QP7403departs 06:50
QP1119departs 08:40
QP1112departs 09:20
QP1110departs 10:30

If QP1820 is cancelled, these are the other Akasa Air nonstop flights from New Delhi to Mumbai on the same day, with scheduled departure times in DEL local time. Most flights posting a delay still operate — rebooking usually only beats a very large posted delay. Every airline on this route →

How QP1820 actually runs

Pro Flight Search has tracked every published board update for QP1820 across the DEL and BOM boards: schedule changes, gate pushes and actual clocks. Usually lands ~13 min late. Based on 10 confirmed landings · 7/10 within 15 min of schedule.

The verdict above is that record speaking, so it reflects how QP1820 operates rather than what the timetable promises. Numbers refresh as new flights operate.

Technical record

How this operation is measured

board clocks

Board log

scheduled → actual, per operation
10-10DEL 19:33 (+0)BOM 19:50 21:11 (+81)
10-09DEL 17:30 (+0)BOM 19:50 20:03 (+13)
10-08DEL 18:05 (+0)BOM 19:50 20:04 (+14)
10-07DEL 18:12 (+0)BOM 19:50 20:08 (+18)
10-06DEL 18:19 (+0)BOM 19:50 20:07 (+17)
10-05DEL 17:48 (+0)BOM 19:50 19:23 (−27)
10-04DEL 17:37 (+0)BOM 19:50 19:32 (−18)
10-03DEL 17:34 (+0)BOM 19:50 19:32 (−18)
10-02DEL 17:50 (+0)BOM 19:50 19:41 (−9)
10-01DEL 17:25 (+0)BOM 19:50 19:24 (−26)

Board clocks recorded as DEL and BOM published them.

Cite this data

Journalists, bloggers, and researchers may cite this page with attribution and a link to Pro Flight Search.

Suggested citation

Pro Flight Search — QP1820 New Delhi to Mumbai on-time performance, measured from the DEL and BOM airport boards.

Canonical URL
https://proflightsearch.com/flight/QP1820
How we measure this →