AI2865Air India · BOM → BLR
live · 9m ago
Route confirmed Air India

AI2865 MumbaiBOM · 19:45 BengaluruBLR · 16:20

AI2865 by Air India flies from Mumbai (BOM) to Bengaluru (BLR) for the Wed, Sep 9 departure.

Right nowExpected in Bengaluru · On Time
16:20

arrival expected at BLR · on schedule

Typical gate push+23 minmedian posted departure
Typical arrival+0 minmedian over 7 operations
Wins back in air~23 minmedian gate push vs arrival · how planes make up time →

Where the minutes go

last 7 operations · gate push → arrival
0+30+60+90 min
09-09
+0 gate
09-08
+23 gate
09-07
+41 gate · +0 arrival
09-06
+28 gate · +0 arrival
09-05
+12 gate · +0 arrival
09-04
+32 gate · +0 arrival
09-03
+0 arrival

The bar is how late it left the gate; the ring is where it actually arrived. Board clocks, not estimates.

The last 30 days

arrival outcome per operation

median arrival +0 min · 0 cancelled · 9 operations tracked

The route today

live boards
BOMMumbaiOn-time likelyBOM delay board →
BLRBengaluruOn-time likelyBLR delay board →
BOM→BLRevery carrier, schedules and on-time historyRoute intelligence →

When it flies

scheduled departures
061422
M
T
W
T
F
S
S

Each mark is a scheduled departure at its origin-local time. Today is highlighted.

Other Mumbai to Bengaluru flights today

same route · Air India
AI2812departs 02:05
AI2410departs 05:30
AI2845departs 05:30
AI2603departs 06:35
AI2851departs 07:55
AI2863departs 09:55

If AI2865 is cancelled, these are the other Air India nonstop flights from Mumbai to Bengaluru on the same day, with scheduled departure times in BOM local time. Most flights posting a delay still operate — rebooking usually only beats a very large posted delay. Every airline on this route →

How AI2865 actually runs

Pro Flight Search has tracked every published board update for AI2865 across the BOM and BLR boards: schedule changes, gate pushes and actual clocks. Usually lands on time. Based on 7 confirmed landings · 7/7 within 15 min of schedule. Pushes back late but makes up time in the air.

The verdict above is that record speaking, so it reflects how AI2865 operates rather than what the timetable promises. Numbers refresh as new flights operate.

Technical record

How this operation is measured

board clocksaircraft

Board log

scheduled → actual, per operation
09-09BOM 19:45 (+0)BLR
09-08BOM 19:45 20:08 (+23)BLR 16:20
09-07BOM 19:45 20:26 (+41)BLR 16:20 (+0)
09-06BOM 19:45 20:13 (+28)BLR 16:20 (+0)
09-05BOM 19:45 19:57 (+12)BLR 16:20 (+0)
09-04BOM 19:45 20:17 (+32)BLR 16:20 (+0)
09-03BOM 19:45BLR 16:20 (+0)
09-02BOM 19:45 (+0)BLR 16:20 (+0)
09-01BOM 19:45 (+0)BLR 16:20 16:05 (−15)

Aircraft

Recent tails: VT-TQL, VTTQL, VT-TNB, VTTQT.

Board clocks recorded as BOM and BLR published them.

Cite this data

Journalists, bloggers, and researchers may cite this page with attribution and a link to Pro Flight Search.

Suggested citation

Pro Flight Search — AI2865 Mumbai to Bengaluru on-time performance, measured from the BOM and BLR airport boards.

Canonical URL
https://proflightsearch.com/flight/AI2865
How we measure this →